Container Glass Furnaces

Container Glass Furnaces

From high temperatures to art: exceptional mastery in container glass furnaces

Discover

Reliable Solutions in
Container Glass Furnaces

Kutu 1

Container glass furnaces are complex industrial facilities that require significant investment and must be designed with maximum precision to ensure long-term and reliable operation.
In these projects, every phase — including furnace erection, refractory installation and dismantling, technological steel applications, insulation, and sealing works — is executed in strict accordance with the project design and under meticulous quality control to ensure flawless performance and extended furnace life.

Kutu 2

Subsequently, critical steps such as furnace ignition, management of thermal processes, and the production of the first glass are executed with the same level of precision and expertise.

Container glass furnaces commissioned with proper applications deliver efficient and sustainable performance for many years, operating 24 hours a day without interruption. In this way, the return on investment is ensured, operational costs are optimized, and production continuity is guaranteed.

Related Projects

Jsc Mina Glass Furnace C

COLD REPAIR: Steel Procurement, Refractory Demolition, Steel Disassembly, Refractory Installation, Steel Assembly, Heat-Up Preparation & Support
  • GTR Georgia, 2025
  • GTR Container
  • GTR TPD 150

Sisecam Anadolu Cam Furnace B

COLD REPAIR: Refractory Demolition, Steel Disassembly, Refractory Installation, Steel Assembly, Heat-Up Preparation & Support
  • GTR Turkiye, 2025
  • GTR Container
  • GTR TPD 450

Turkmen Glass Container Glass Furnace B

NEW FURNACE: Steel Assembly, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkmenistan, 2025
  • GTR Container
  • GTR TPD 120

Jcs Mina Glass Furnace B

COLD REPAIR: Steel Procurement, Refractory Demolition, Steel Disassembly, Refractory Installation, Steel Assembly, Heat-Up Preparation & Support
  • GTR Georgia, 2023
  • GTR Container
  • GTR TPD 150

Basturk Cam Container Glass 2

NEW FURNACE: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2023
  • GTR Container
  • GTR TPD 560

Gurok GC2

NEW FURNACE: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2021
  • GTR Container
  • GTR TPD 400

Sisecam ACS Yenisehir Furnace C

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2020
  • GTR Container
  • GTR TPD 500

Nigeria Frigo Glass

COLD REPAIR: Steel Procurement
  • GTR Nigeria, 2019
  • GTR Container
  • GTR TPD 200

Vetropack Nemsova

COLD REPAIR: Steel Procurement
  • GTR Slovakia, 2019
  • GTR Container
  • GTR TPD 300

Verallia Lagnieu F1 Container Glass Furnace

COLD REPAIR: Steel Procurement, Refractory Demolition, Steel Disassembly, Refractory Installation, Steel Assembly, Heat-Up Preparation & Support
  • GTR France, 2019
  • GTR Container
  • GTR TPD 250

Sisecam ACS Yenisehir Furnace B

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2018
  • GTR Container
  • GTR TPD 500

Sisecam ACS Eskisehir Furnace D

NEW FURNACE: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2018
  • GTR Container
  • GTR TPD 500

Turkmenistan Container Glass Furnace

GREENFIELD: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkmenistan, 2017
  • GTR Container
  • GTR TPD 50

Sisecam Anadolu Cam Mersin F20 Furnace

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2016
  • GTR Container
  • GTR TPD 200

Vidroporto Glass Brasil

COLD REPAIR: Steel Procurement
  • GTR Brasil, 2014
  • GTR Container
  • GTR TPD 200

Jsc Mina Glass Furnace

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Georgia, 2014
  • GTR Container
  • GTR TPD 120

Gurok GC1

GREENFIELD: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2014
  • GTR Container
  • GTR TPD 300

Parkcam Ciner

NEW FURNACE: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2013
  • GTR Container
  • GTR TPD 400

Nampak Glass South Africa

COLD REPAIR: Steel Procurement
  • GTR South Africa, 2013
  • GTR Container
  • GTR TPD 200

Sisecam Anadolu Cam Mersin

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2013
  • GTR Container
  • GTR TPD 200

Jsc Mina Glass Furnace

NEW FURNACE: Steel Procurement, Refractory Installation, Steel Assembly, Heat-Up Preparation & Support
  • GTR Georgia, 2012
  • GTR Container
  • GTR TPD 100

Anadolu Cam Eskisehir

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2012
  • GTR Container
  • GTR TPD 400

Sisecam Anadolu Cam Topkapi Furnace A

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2009
  • GTR Container
  • GTR TPD 200

Sisecam Bursa Yenisehir Furnace B

NEW FURNACE: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2007
  • GTR Container
  • GTR TPD 500

Sisecam Ruscam Ufa

NEW FURNACE: Refractory Installation, Heat-Up Preparation & Support
  • GTR Russia, 2007
  • GTR Container
  • GTR TPD 200

Sisecam Anadolu Cam Topkapi Furnace D

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2006
  • GTR Container
  • GTR TPD 200

Sisecam Yenisehir Furnace A

NEW FURNACE: Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2006
  • GTR Container
  • GTR TPD 500

Sisecam Anadolu Cam Mersin Furnace B

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2006
  • GTR Container
  • GTR TPD 200

Sisecam Anadolu Cam Topkapi Furnace B

COLD REPAIR: Refractory Demolition, Refractory Installation, Heat-Up Preparation & Support
  • GTR Turkiye, 2005
  • GTR Container
  • GTR TPD 150

Sisecam Acs Eskisehir A.B.C.D Container Glass Furnaces

YEARLY MAINTENANCE- HOT REPAIR: 4 furnace maintenance yearly contract
  • GTR Turkiye, 2020
  • GTR Container
  • GTR TPD 500

Sisecam Anadolu Cam Mersin Furnace 20

HOT REPAIR: Furnace hot repair
  • GTR Turkiye, 2010
  • GTR Container
  • GTR TPD 200

To date, GTR has successfully completed more than 30 container glass furnace projects. These projects have been carried out in countries such as Türkiye, France, Brasil, Georgia, Bulgaria, Russia, Turkmenistan, Nigeria, South Africa and the Czech Republic, where refractory erection and dismantlingatrampagehot repair, and technological steel fabrication were executed with the highest precision. In addition, we offer turnkey solutions for small- and medium-scale projects. With our experienced team, we ensure optimum efficiency and reliability at every stage of your project.

High-Performance Container Glass Furnaces

"In the highly competitive packaging industry, the efficiency of container glass furnaces directly impacts profitability and product quality. GTR specializes in the design, construction, and maintenance of these critical melting units used for producing bottles, jars, and pharmaceutical glass.Our engineering team focuses on optimizing the thermal profile and refractory stability of container glass furnaces. By integrating advanced combustion technologies with durable lining materials, we ensure that your furnace delivers consistent glass homogeneity, reduced energy consumption, and an extended campaign life."

GTR’s Distinctive Strengths
People-First OHS Approach
People-First OHS Approach Our people-first philosophy shapes every solution we offer, reflecting our responsibility for health, development, and human labor.
Operational Excellence
Operational Excellence We aim to maximize efficiency, quality, and speed across every project we undertake — through meticulous planning, smart resource use, and innovative solutions.
Proactive & Solution-Oriented Approach
Proactive & Solution-Oriented Approach We take a proactive, solution-oriented approach by anticipating risks, developing timely alternatives, and dynamically managing processes based on real-time insights and evolving customer needs.
Photo Gallery